This design studio continues to develop and refine the studio project from ARCH 4820. In this course "students develop the ability to make design decisions within architectural projects while demonstrating integration of building envelope systems and assemblies, structural systems, environmental control systems, life safety systems, and the measurable outcomes of building performance." NAAB (SC.6 Design Integration).
Spring | Summer | Fall | ||
---|---|---|---|---|
(Session 1) | (Session 2) | |||
2024 |
Integrated Design Development Studio (5c)
|
|||
2023 |
Comprehensive Design Studio 2 (5c)
|
Integrated Design Development Studio (5c)
|
||
2022 |
Integrated Design Dev Studio (5c)
|
|||
2021 |
Integrated Design Dev Studio (5c)
|
|||
2020 |
Integrated Design Development Studio (5c)
|
|||
2019 |
Integrated Design Development Studio (5c)
|
|||
2018 | ||||
2017 |
Integrated Design Development Studio (5c)
|
|||
2016 | ||||
2015 | ||||
2014 | ||||
2013 | ||||
2012 | ||||
2011 | ||||
2010 | ||||
2009 | ||||
2008 | ||||
2007 | ||||
2006 | ||||
2005 | ||||
2004 | ||||
2003 | ||||
2002 | ||||
2001 | ||||
2000 | ||||
1999 | ||||
1998 |